Jesa Farm Dairy
200 kWp PV with genset integration
At Uganda's largest independent dairy, solar now carries processing lines that run without a break.

Project References
Since 2011 we've designed and built solar and storage for factories, hospitals, schools, hotels, broadcasters and humanitarian programmes across Uganda, Kenya and Tanzania. Every entry is a real client and a real site, so have a look and find the one closest to yours.
4,074 kWp
solar PV installed
3,923 kWh
battery storage installed
70+
projects delivered
15
years in East Africa

200 kWp PV with genset integration
At Uganda's largest independent dairy, solar now carries processing lines that run without a break.

500 kWp PV + 200 kWh battery
This tea factory on a shaky rural grid runs on our largest hybrid system yet.

250 kWp grid-tied PV
A growing food processor now covers its full daytime load with solar under a power purchase agreement.

Industrial power pre-feasibility study
We looked at power supply options for an industrial site so the investor could decide early.
.webp)
3 kWp PV + 5 kWh battery
A fleet of electric bicycles now charges on low-cost solar.

System analysis, repair and ongoing O&M
We found and fixed the faults in an office solar system, and we now keep it running.
Solar sizes are given in kWp, the peak output of the panels, and battery sizes in kWh, the energy the batteries can store. Backup systems add batteries or a generator so the power stays on in an outage, and Solar Savings systems work alongside the grid to cut the daytime bill. Off-Grid systems run with no grid at all, and Study and design marks work where we delivered a study or a design rather than an installation.
Sector
Type of work
System type
Year
Showing 72 of 72 projects

10 kWp PV + 20 kWh battery
A remote lodge in Kitgum that used to run entirely on diesel now runs mostly on solar.
.webp)
3 kWp PV + 5 kWh battery
A fleet of electric bicycles now charges on low-cost solar.

5 kWp PV + 10 kWh battery
Once the school system had proven itself, Amasiko added a second one for its guest house.
.webp)
About 50 kWp PV + 110 kWh battery
A remote safari lodge now runs through the whole day on solar, even though its grid supply is poor.

32 kWp PV + 60 kWh battery
One backup system now keeps a whole compound of field offices running on a weak grid.

National agrivoltaics guidelines
We helped shape Uganda's national guidelines for solar power and farming on the same land.

50 kWp PV + 80 kWh battery
This boarding school on a weak grid gets the same engineering we put into hospitals.

6 kWp PV + 20 kWh battery
A private home in Kitende now keeps its power on through every outage.

7 kWp PV + 25 kWh battery
A small clinic gets hospital-grade reliability at a size its budget can carry.

50 kWp PV + 100 kWh battery
A new CT scanner now has its own solar and battery supply that keeps it running through outages.
/Next Media Park (NBS).webp)
86 kWp PV + 96 kWh battery
Uganda's largest independent media house now runs part of its round-the-clock broadcasting on solar.

45 kWp PV + 90 kWh battery
Reliable, quiet power for a Soroti resort that used to run on a generator.

54 kWp PV + 100 kWh battery (supermarket), 39 kWp PV (restaurant)
A supermarket and a restaurant next to each other got two solar systems under one deal.

Solar systems at 250 health centres, plus O&M
We brought solar power to 250 rural health centres across Uganda.

303 kWp grid-tied PV
We built our largest grid-tied system yet for a regional fish farming company.

5 kWp PV + 10 kWh battery
A vocational college on a weak grid now has steady power for classrooms, workshops and dormitories.

50 kWp PV + 120 kWh battery
A premium apartment complex now has solar backup that can run the whole building without the grid.

10 kWp PV + 10 kWh battery
The farm at a Soroti youth foundation now has steady power for its tools and lighting.

30 kWp PV + 30 kWh battery
A skills centre in Soroti now has steady power for workshops, classrooms and dormitories.

250 kWp grid-tied PV
A growing food processor now covers its full daytime load with solar under a power purchase agreement.

20 kWp grid-tied PV
A premium Kampala school now pays less for daytime power, with no change to its grid connection.

15 kWp PV + 17 kWh battery
A company working on e-mobility and second-life batteries now runs its workshop on solar.

65 kWp grid-tied PV
A busy private hospital in Kampala went solar without paying anything upfront.

120 kWp PV across two plants
Two neighbouring plants got a solar system each under one power purchase agreement, with no upfront cost.

Solar feasibility studies, dairy cooperatives
We studied whether solar makes sense for dairy cooperatives in Uganda.

Solar-and-storage research lab
We built a solar and battery lab in Kajjansi for research and training.

Solar-and-storage research lab
We built a solar and battery lab in Kisumu for research and training.

Solar-and-storage research lab with floating PV
We built a research lab in Tanzania that includes solar panels floating on water.

Industrial power pre-feasibility study
We looked at power supply options for an industrial site so the investor could decide early.

130 kWp grid-tied PV
A large rooftop system follows the university's academic day and cuts its power bill.

250 kWp PV + 200 kWh battery
A large rose farm exporting to Europe now powers its work and refrigeration with solar and batteries.

500 kWp PV + 200 kWh battery
This tea factory on a shaky rural grid runs on our largest hybrid system yet.

12 kWp PV + 28 kWh battery
A full apartment block now has silent backup power through frequent outages.

Solar and EV feasibility, 6 residences
We drew up one solar and electric vehicle plan covering six embassy residences.

58 kWp grid-tied PV
A coffee processor and exporter in Namanve now uses solar through its processing hours.

5 kWp PV + 10 kWh battery
These eco-tourism cottages now have quiet power, with no generator noise near the guests.

Energy policy issue briefs, agri-food sector
We wrote energy policy briefs for Uganda's agriculture and food sector.

Solar-supplied boda-boda charging station
The Yujo restaurant now has a charging station for electric boda-bodas that runs on its solar.

Wallbox car charger, solar-supplied
The restaurant added a wall-mounted car charger that runs off its own solar.

7 kWp PV + 15 kWh battery
A rural school with no grid connection now has power for its classrooms and evening study.

100 kWp PV + 120 kWh battery
This hospital cannot ride out an outage, so we gave its theatres and imaging uninterrupted power.

Eco industrial park energy model
We worked out the energy and solar side of a national model for eco industrial parks.

Wallbox EV charger installation
We installed a wall-mounted charger for electric vehicles at the GIZ country office.

Root-cause analysis and repair plan
We found out why an office solar system was underperforming and how to fix it.

System analysis, repair and ongoing O&M
We found and fixed the faults in an office solar system, and we now keep it running.

50 kWp grid-tied PV
A dairy farm in Kapeeka now saves on refrigeration and pumping by running them on solar by day.

95 kWp grid-tied PV across the complex
One set of solar systems now serves a hotel, a restaurant and a supermarket in the same complex.

150 kWp grid-tied PV
Steady power for a Kampala meat processor that can't let the cold chain slip.

75 kWp PV + 120 kWh battery
A maker of ceramic water filters now runs its daily production on solar.
/Picture2.webp)
RE and efficiency solutions, 7 tea factories
We planned renewable energy and efficiency measures for seven tea factories at once.

200 kWp PV with genset integration
At Uganda's largest independent dairy, solar now carries processing lines that run without a break.

7 kWp PV + 3.5 kWh supercapacitor
Solar now runs a wastewater treatment pilot inside a working hospital.

National borehole solarisation roadmap
We drew up a national roadmap for moving water boreholes onto solar pumping.

Design of PV plant extension up to 500 kWp
We designed the extension of a radio station's solar plant in Arua.

Site training for green banking participants
We turned a working solar plant into a classroom for bankers.

5 kWp PV + 3.5 kWh battery
A small solar system keeping the lights and phones on at a children's home.

35 kWp grid-tied PV
A Kampala restaurant now pays less for its kitchen and cooling thanks to rooftop solar.

Load assessments and RE design, 10 sites
We measured power use at ten sites and matched each one with a renewable energy solution.

Load assessment and solar backup design
We took an office solar backup from site survey to a specification ready for tender.

Economic feasibility, UNHCR sites
We worked out whether solar makes economic sense at the UNHCR sites.

Load and site assessments, 7 UNHCR sites
We assessed power use and site conditions at seven refugee settlement sites.

28 kWp grid-tied PV
A lakeside resort south of Kampala now uses its own solar power through the day.

22 kWp PV + 21 kWh supercapacitor
This was the first hospital backup of this size in Uganda to use supercapacitor storage.

12 kWp grid-tied PV
We built this rural mission hospital's system together with its sister site at Naggalama.

12 kWp grid-tied PV
This first system at Naggalama started a long working relationship with the hospital.

Solar suitability assessment, water sector
We took a first look at where solar could work across National Water's infrastructure.
_edited.webp)
Multi-site feasibility and concept design
Our early work with tea factories led on to later programmes in the sector.

15 kWp PV + 30 kWh battery
Our first project outside Uganda combined four sources of power at one site.

Additional 20 kWp PV, with battery backup for critical loads
Two years later, a second phase added more solar and a lifeline for the critical wards.

Solar feasibility and load assessment
We studied the power use at a Kampala hotel and worked out what solar could do for it.

52 kWp grid-tied PV
The first solar system at this Kampala mission hospital cut its daytime power bill.

12 kWp PV + 3.5 kWh battery
One of our first installations for an institution is still running years later.
From the Knowledge Hub
We wrote these notes from our own sites. They explain how the systems behave after years of running and why we made the engineering calls we did.
Project update
A hospital relationship that started with 12 kWp in 2019 now carries a CT scanner through grid interruptions. Here is what changed at each step, and why.
4 min read →Project update
A 250 kWp grid-tied system at Sumz Food Industries in Nkoowe covers the full daytime process load and was delivered under a PPA. Here is why the sizing worked out the way it did.
3 min read →Project update
Next Media Park in Kampala has 86 kWp of PV and 96 kWh of storage. Broadcast runs 24 hours a day, which changes what a solar system has to be.
3 min read →Technology brief
A battery on a weak Ugandan grid works harder than the same battery in a stable market. Chemistry choice follows from that, and so does service life.
4 min read →Technology brief
Uganda has no net metering for commercial and industrial users. That single fact shapes how every grid-tied system on this site gets sized.
3 min read →