These are real questions from commercial and industrial clients across East Africa, answered by our engineers. If yours is not here, a 20-minute call with an energy expert will cover it.

Cost, pricing and payback

What a commercial system costs, how fast it pays back, and how it compares to grid and diesel.

How much does a commercial solar system cost in Uganda?

The price depends on the size of the system, whether it has a battery, and the site: roof or ground mount, distance and grid connection. The price per kWp (kilowatt peak, the rated output of the panels) falls as systems get larger, and a battery raises the price, because storage is a large part of the system.

We size every system to your power use and your site. Send us your electricity bills and a short description of the site, and our engineers give you a first estimate.

What payback period can I expect?

A panel-only Solar Savings system usually pays for itself in 3 to 5 years. The exact figure depends on how much grid and diesel power the system replaces and how many hours your site runs in daylight. A Backup system is bought for power without interruption, so we do not quote a payback for it.

What return does solar give over its life?

A panel-only Solar Savings system returns about 20 to 30 percent a year over a life of 25 years or more. It gives the strongest return of our systems because it has no battery to replace.

Is solar cheaper than grid power?

Yes, for sites that use most of their power during the day. A well-sized system replaces a large share of your daytime grid consumption at a cost that is fixed on day one. Grid tariffs tend to rise over time.

How much diesel can solar save?

With solar in front of the generator, most sites use 40 to 60 percent less diesel across the year. A hybrid system combines solar panels, and often batteries, with your grid supply and generator. A full Off-Grid system can take diesel out of daily operation.

Are there hidden costs?

No. We quote one fixed price for the full scope under a single contract. The price covers supply, shipping, customs, installation and commissioning, which is testing the system and handing it over. Your running costs afterwards are cleaning and maintenance, which an operation and maintenance (O&M) plan can cover.

Is solar equipment taxed in Uganda?

Solar systems are exempt from VAT in Uganda, so a system quotation shows 0 percent VAT. Switchboards and O&M services attract VAT. Tax rules change from year to year, so we confirm the current position for your scope when we quote.

Compare Solar Savings, Backup and Off-Grid systems →

System sizing and design

How we size a system to your real load, and the difference between Solar Savings, Backup and Off-Grid systems.

How do you decide what size system I need?

We size from your power bills and your load, and where needed a logger on site records how much power you use, usually for one to four weeks. The design then rests on your actual consumption.

Why is the system bigger than my peak load?

The array is larger than your peak load because solar output changes through the day and with the weather, and the panels also charge the battery. As a rough guide, a 25 kW peak load often needs around 65 kWp of panels.

Can I start small and expand later?

Yes, because the systems are modular. We size the cabling and the inverter, the unit that turns solar power into the power your site runs on, for your target load now. You then add panels or batteries in stages as your demand grows.

What is the difference between a Solar Savings, Backup and Off-Grid system?

A Solar Savings system has panels only, a Backup system adds a battery, and an Off-Grid system adds a larger battery.

  • Solar Savings: panels only, connected to the grid. It cuts your daytime bill and gives no cover during an outage.
  • Backup: panels plus a battery. It keeps your site running through outages and carries it for a set number of hours at night.
  • Off-Grid: panels plus a larger battery. It runs your site around the clock without the grid.
How many hours of backup can I get?

The hours depend on the size of the battery compared with your consumption. A battery sized for about one day of use gives a few hours of evening cover. Running around the clock on your own needs a battery of about two and a half to three times your daily consumption.

Can solar run my three-phase machines?

Yes. We use three-phase hybrid inverters at 400/230 V, 50 Hz. Motors, compressors, autoclaves and variable-speed drives run normally when the system is sized for the extra power they draw as they start.

Will it handle heavy motor starting currents?

Yes, with correct sizing. A motor draws far more power as it starts than while it runs, so we size the battery inverter, rated in kVA, with margin to spare. Very large motors that start directly on the supply may need a soft starter or a drive.

See how our energy audits measure your real load →

Equipment, quality and standards

The brands we build with, the warranties they carry, and the standards we install to.

Which brands do you use?

We use Jinko Solar panels, Deye inverters and Deye, BYD or Dyness batteries.

  • Panels: Jinko Solar, Tier 1.
  • Inverters: Deye for commercial and industrial systems. Sungrow, Huawei, GoodWe and Solis on larger panel-only projects.
  • Batteries: Deye, BYD and Dyness.
  • Mounting: aluminium rail with clamp or ballast fixings.
What warranties come with the equipment?

Panels, inverters and batteries carry the manufacturer's warranty, and we give 2 years on our installation workmanship.

  • Panels: 12-year product warranty, 30-year performance warranty.
  • Hybrid inverters: 5 to 10 years.
  • Batteries: 10-year product and performance warranty.
  • Our installation workmanship: 2 years from commissioning.
Are your components Tier 1?

Yes. Our panels come from manufacturers on the BloombergNEF Tier 1 list, which measures whether banks trust a maker enough to finance projects built with its products. Inverters and batteries come from established brands with local warranty support.

Why do you use Deye inverters?

We use Deye because it has local service and spare parts across East Africa. That support network matters as much as the hardware. We have installed more than 200 Deye inverters.

What standards do you build to?

We install to IEC standards for panels, inverters and batteries, and to the ERA wiring regulations for Uganda.

  • Panels: IEC 61215 and IEC 61730.
  • Inverters: IEC 62109 and IEEE 1547.
  • Batteries: IEC 62619.
  • Installation: IEC 62446 and the ERA wiring regulations for Uganda.
What lightning and surge protection is included?

Our inverters include built-in surge protection for indirect lightning strikes. For exposed or high-risk sites we add external DC surge arrestors. Lightning rods and earthing for the building stay part of the building’s own protection, and we advise on both.

Read why we specify LFP batteries on weak grids →

Installation and project process

How long a project takes, what we handle, and what we need from you.

How long does a project take?

Most projects take 4 to 6 months from start to finish. A signed contract usually follows the first site survey within 4 to 8 weeks. From contract to commissioning takes about 3 to 4 months for an imported system.

What are the payment terms?

Payment is staged across the project, with the largest share due with the order because we pay for the material when we place it. The exact schedule is in your quote.

Do you handle imports and customs?

Yes. Shipping, customs clearance and transport to site are part of our scope, so you deal with one contract for the whole project.

What do you need from us?

We need four things from you and handle everything else in the scope.

  • A sound, unshaded roof or ground space.
  • Access to your power connection point.
  • A contact person on site.
  • Any permits needed for installation and grid connection, which we help arrange.
Will my operation shut down during installation?

No, your operation does not need a full shutdown. We plan one short outage of a few hours for the final connection, at a time that suits your operation.

Can I see a working system before I sign?

Yes. We arrange reference visits to our office and to client sites near Kampala, so you can see installed systems and talk to the people who run them.

See how we deliver a project, step by step →

Financing and ownership

How you can pay for a system. Financing comes from our partners, not from Equator Solar.

What are my options to pay for a system?

You can pay by direct purchase, by lease-to-own or with a bank loan.

  • Direct purchase: you buy the system and own it from day one.
  • Lease-to-own: a finance partner pays for the system and you pay a fixed monthly fee, and ownership passes to you at the end.
  • Bank finance: a bank funds the purchase and you repay the loan.

Equator Solar does not provide financing. Our finance partners arrange lease and finance structures, and that agreement is between you and the partner.

Does Equator Solar provide the financing?

No, Equator Solar does not provide financing. We design, supply, install and service the system, and the financing comes from our finance partners. If you choose a lease or a loan, your funding contract is with the partner, and we introduce you to the partners we work with.

What is a solar lease?

A solar lease means a finance partner owns and funds the system and you pay a fixed monthly fee. Ownership transfers to you at the end of the term. The lease agreement is with the finance partner, who sets the terms for maintenance and insurance.

What is the difference between a lease and a PPA?

Under a lease you pay a fixed monthly fee, and under a power purchase agreement (PPA) you pay for each unit of electricity the system produces. In Uganda, most commercial and industrial systems are structured as a direct purchase or a lease.

Can I buy out a lease early?

Most lease structures allow an early buy-out, usually from a few years into the term, at a value that falls over time. The exact terms are in your agreement with the finance partner.

Do I have to pay everything upfront on a direct purchase?

No. Payments for a direct purchase are staged across the project, with the largest share due with the order. The schedule is in your quote.

Read how a food processor runs on solar under a PPA →

Operation, monitoring and maintenance

How we keep a system performing: monitoring, service plans, response times and warranty claims.

Do you monitor the system remotely?

Yes. We monitor every system we install remotely through the manufacturer’s platform. Under an operation and maintenance (O&M) contract we also act on the alerts and performance data we see.

What maintenance does a solar system need?

A solar system needs regular cleaning, inspection and performance checks. A typical maintenance plan includes:

  • Ongoing remote checks of how the system performs.
  • Panel cleaning, scheduled to how dusty your site is.
  • An on-site inspection twice a year.
  • A full annual service with a thermographic scan, which uses a heat camera to find faulty panels and loose connections.
What does an O&M contract cost?

The cost depends on the size of the system and the service level you choose. We scope the plan to your system and site and quote it with the system.

What service plans do you offer?

We offer a basic and a premium plan, and clients with several sites can take a portfolio contract. The basic plan covers monitoring, alerts, phone support and one annual inspection. The premium plan adds scheduled preventive maintenance, corrective labour, travel and half-year performance reports.

How fast do you respond to a fault?

Under an O&M contract, we respond to critical faults the same day or the next day. Emergency dispatch anywhere in Uganda takes up to 48 hours. We usually reach sites in Kampala and West Nile the same day, and routine items wait for the next scheduled visit.

What uptime can I expect?

Under an O&M contract we target 98 percent uptime or better, which means the system works at least 98 percent of the time. This is a target. We do not give a general uptime or yield guarantee.

How does a warranty claim work?

If a component fails within warranty, we handle the claim with the manufacturer. We diagnose the fault remotely or on site, fit a replacement as soon as the manufacturer supplies it, and return the faulty unit.

Do you train our staff?

Yes. At handover we train your team on operation, monitoring, safety and routine checks, with refresher sessions on request.

See our operation and maintenance service →

Roof, structure and safety

Whether your roof can carry a system, how we protect it, and how we keep the installation safe.

Can my roof carry the weight of solar panels?

Most industrial and commercial roofs can carry solar panels. Panels and mounting add about 15 to 20 kg per square metre. At the site survey we check the roof structure, the sheet thickness and the roof condition, and we confirm it can carry the load before any work begins.

What if my roof is old or the sheets are thin?

We check the roof at the survey, before the contract, and an old or thin roof can usually be supported. We can replace sheets, add reinforcement at the fixing points, use ballasted mounting or move the array to a ground mount. Ballasted mounting is held down by weight and needs no drilling.

Will the roof leak where panels are fixed?

A correctly installed roof mount does not cause leaks. We seal every fixing with gaskets and sealant. We also record the roof condition before we start, so the starting condition is documented.

How much roof space do I need?

Modern panels need about 6 square metres of roof per kWp. For example:

  • 50 kWp: about 300 square metres.
  • 100 kWp: about 600 square metres.
  • 500 kWp: about 3,000 square metres.

The roof should be unshaded and sound. A ground mount is an option where roof space is tight or unsuitable.

Do you offer ground-mounted systems?

Yes. A ground mount suits sites with available land, weak or damaged roofs and larger installations. It adds cost for the steel structure and civil works.

How often do panels need cleaning?

Cleaning every two to three months suits urban and industrial sites near Kampala or Jinja. Sites near cement works, sugar mills or unpaved roads may need monthly cleaning. Rural sites away from dust need it less often, and rain does much of the work in the rainy season.

Are solar systems safe?

Yes, when they are properly engineered and installed. We build in arc-fault protection, which detects dangerous sparking in the wiring, together with rapid shutdown, isolation and earthing. We install to international safety standards and the wiring regulations for Uganda.

What is rapid shutdown?

Rapid shutdown is a single switch that drops the DC voltage on the roof to a safe level within seconds. DC is the direct current coming from the panels. It protects firefighters and maintenance teams, and our commercial rooftop systems include it as standard.

Browse the rooftop and ground-mounted systems we have built →

Power, backup, grid and generator

How the system behaves during outages, works with your generator, and runs off-grid.

What happens during a power outage?

A Backup system switches to battery within milliseconds, so your operation keeps running without a visible interruption. A Solar Savings system has no battery and shuts down during an outage for safety. It starts again when the grid returns.

Will solar work with my existing diesel generator?

Yes. Every hybrid system works with your generator and draws power in order of priority: solar first, then battery, then grid, and the generator last.

Will my generator run less once solar is installed?

Yes. Most sites see generator running hours drop by 40 to 60 percent, which also extends the generator’s life. A full Off-Grid system can take the generator out of daily use.

Can I feed excess solar back to the grid?

No, commercial and industrial users in Uganda cannot sell surplus solar power back to the grid. Uganda does not offer net metering, where the utility credits you for power you send back. We therefore set systems to zero export, which means the system never sends power into the grid, and we design them so you use your solar power on site.

Will the utility disconnect me for having solar?

No. With zero export set correctly, the system never pushes power into the grid, and that is the condition utilities care about.

How long do batteries last?

The batteries we use typically last 12 to 15 years in service and carry a 10-year product and performance warranty. Over a 25-year system life, plan for one battery replacement.

What shortens battery life, and how do you protect against it?

Deep draining, high temperatures and hard cycling age a battery. Hard cycling means frequent heavy charging and discharging. We set a minimum charge level the battery is never drained below, monitor temperature continuously and configure charging to protect the cells.

Can I run my whole site off-grid?

Yes, with a system sized to run your site around the clock on its own. This suits remote sites, places with a weak grid, health centres, lodges and farms. We size the battery to carry you through cloudy spells, with a generator as an optional backup.

What happens on cloudy days off-grid?

A well-sized Off-Grid system carries you through two to three days of low sun. Uganda gets steady sun all year, and in the rainy season output drops but does not stop. For longer spells we plan a backup generator or extra battery capacity.

See how Backup and Off-Grid systems keep you running →

Regulation, risk and insurance

Permits, licensing for your own-use system, insurance and data security, and who backs your warranties.

Do I need a licence to install solar for my own use?

For a system that powers only your own site, the requirements are light. Smaller captive systems, which supply only your own site, and off-grid systems are registered with the Electricity Regulatory Authority rather than fully licensed. We handle the registration and permits as part of our scope. We confirm the current requirements for your project, as they can change.

Do you handle grid-connection approvals?

Yes. For grid-tied systems we prepare the applications for the utility and the regulator, set the system for zero export, and manage the approval process for you.

Should I insure the solar system?

Yes, you should insure the system. For a direct purchase, most clients add it to their existing building or business insurance at a small premium. Under a lease, the finance partner usually arranges the insurance. If your insurer needs it, we can point you to brokers experienced with solar.

Do you quote in dollars or shillings?

We quote in US dollars by default, because equipment and international warranties are priced in dollars. We accept payment in dollars, shillings or euros, and we can structure long-term contracts to suit your revenue currency.

Is my system data secure?

Yes. Monitoring runs over an encrypted connection with no direct exposure to the open internet. We change default passwords and close any access that is not needed. For sensitive sites we can run monitoring in a closed mode.

Who honours my warranties, and can another company service the system?

Your component warranties for panels, inverters and batteries sit with the manufacturers and stay with the system. Those brands honour them internationally. We build with standard, widely supported equipment. On request we hand over all documentation, monitoring access and design files, so any qualified company can service the system. We have operated in East Africa since 2011.

Read how zero export and grid approvals work in Uganda →

Sectors and about Equator Solar

Our track record, the sectors we serve, and how to start a conversation.

How many projects have you completed?

We have installed more than 300 systems across East Africa since 2011, with about 4 MWp of solar panels and 3.9 MWh of battery storage. One MWp is 1,000 kWp, and one MWh is 1,000 kWh.

Do you work outside Kampala?

Yes. We work across Uganda, from Fort Portal and Mbale to Arua, Soroti and Jinja, and in Kenya and Tanzania. Under the UNICEF programme with the Ministry of Health, we installed solar at 250 rural health centres.

What size systems do you build?

We build from about 20 kWp for a small commercial site into the megawatt range. The largest system we have built is 500 kWp at Kyamuhunga Tea Company. We size every system to the load of your site.

Which sectors do you work in?

We work in manufacturing, health, education, agriculture and agro-processing, hospitality, communication and humanitarian programmes. In hospitals and health centres we size the battery around the critical loads.

Can you keep a hospital’s critical loads running?

Yes. We size the battery around critical loads such as theatres, ICUs and the cold chain for vaccines and medicines. The system switches over automatically when the grid fails, so the equipment keeps running.

Can you name some reference clients?

Yes. They include Jesa Farm Dairy, Lubaga and Naggalama Hospitals, Corsu Rehabilitation Hospital, Spouts of Water, Kyamuhunga Tea, Radio Pacis, Total Bunamwaya, Acaki Lodge, GIZ, and 250 UNICEF health centres.

How much carbon does a solar system save?

A 100 kWp system in Uganda saves in the order of 14 tonnes of CO2 a year. The figure varies with the size of the system and how you use it.

What happens to panels and batteries at end of life?

Silicon panels are largely recyclable. Where local recycling is not yet available, we store the equipment for return to the manufacturer or to specialist recyclers. Batteries go back to their makers.

Is the first consultation free?

Yes. The first call takes 20 minutes and carries no obligation. We use it to understand your needs and suggest the next steps.

Browse our project references →

Still have a question?

Tell us about your site and how you use power. The first call takes 20 minutes with no obligation, and at the end we suggest the next steps.

Talk to an energy expert →

Or call 0707 670 251.

73 questions across 10 topics.