EPC Delivery Model

We run your project from audit to service.

Equator Solar is an EPC contractor in Uganda. We engineer, buy, build and commission the whole system and then keep it running, so you deal with one accountable team from the first site visit to long-term maintenance.

4,074 kWp

Solar capacity installed

3,923 kWh

Battery installed

300+

Systems delivered

15

Years in East Africa

What EPC means

We engineer it, buy it, build it and keep it running.

EPC stands for engineering, procurement and construction. In practice one contractor carries the whole project and answers for the result, so you have one contact when something needs fixing. We work out how much power you use and design the system on that data. We buy the components, build and commission the system with our own team and maintain it afterwards.

How we deliver

Three things we handle ourselves on every project.

Engineer

Engineering-led design

We work out your real power use before we size anything, and then design the system on that data.

Energy workshop with GIZ and industry representatives in Kampala, Uganda

Every system starts with your data. We read your power bills and, where they do not tell the full story, log your consumption for one to four weeks, check how often the grid really fails and build a financial model on your numbers. You get a system sized to your operation, with documentation that banks and development funders accept, and we do the same kind of feasibility work for GIZ, UNICEF and UNHCR.

  • Load measured before design
  • Financial model on real numbers
  • Documentation funders accept

7 to 30 days

Load logged first

40+

Advisory studies

Procure & construct

In-house construction and controls

Our own team builds the system and connects solar, battery, grid and generator to one controller.

Equator Solar crew installing solar panels on a factory roof in Uganda

We buy components from the top-ranked (tier-one) manufacturers and build with our own crews, so quality and safety stay under our control. The hard part of an industrial system is making solar, battery, grid and generator hand over to each other automatically without a gap. We do that engineering in house, on systems from 20 kWp into the megawatt range.

  • Built by our own crews
  • Tier-one components
  • Solar, battery, grid and generator working as one

500 kWp

Largest system built

300+

Systems built

Operate

Long-term operation and maintenance

We monitor the system remotely, catch faults early, and keep it performing for its full lifetime.

Solar array on the roof of Corsu Rehabilitation Hospital, kept running under an O&M contract

A system that nobody watches fails quietly. Under an O&M (operation and maintenance) contract we monitor your system remotely, flag faults automatically and visit on schedule. Contracts run from one to five years with emergency response anywhere in Uganda, so the system keeps making the power it was built to make long after commissioning.

  • Remote monitoring, faults caught early
  • Scheduled preventive maintenance
  • Emergency response across Uganda

1 to 5 yr

O&M contracts

48 h

Emergency response, O&M contracts

100%

O&M portfolio monitored

25 yr

Design lifetime

The delivery process

The six stages from first site visit to long-term service

Every project runs through the same six stages. The timeline depends on system size and site. The sequence and the accountability stay the same.

1

Audit & feasibility

We measure your power use, check how reliable the grid is and build a financial model on your real consumption.

2

Engineering & design

We complete the electrical and mechanical design, size the system and prepare technical documents that banks accept.

3

Procurement

We source and quality-check tier-one components and state the specification of every part in writing.

4

Construction & installation

Our own crews build the system, with safety under our control.

5

Commissioning & handover

We test the system, make sure solar, battery, grid and generator work together and hand over with training for your staff.

6

Operation & maintenance

Under a 1 to 5-year contract, we monitor the system remotely, service it on schedule and respond to emergencies.

2 to 6 weeks

Audit to design (typical)

4 to 12 weeks

Build to commissioning (typical)

Why it holds up

We bring a German engineering standard to Uganda.

Our German technology partners set the engineering discipline. We apply it to East African conditions: weak grids, heavy reliance on diesel and a supply chain with little room for shortcuts.

German technology partners

We work with NEXIRA in Kassel and renergy consulting in Ettenheim on engineering and design.

Tier-one components only

We use Jinko solar panels, Huawei and Deye inverters and BYD and Dyness batteries, and we name them on every proposal instead of a generic substitute.

One accountable team

The same contractor designs, builds, commissions and maintains your system. You have one point of responsibility from design to service.

A finance partner can fund the system under a power purchase agreement (PPA). You then pay for the solar power you use and do not buy the hardware.