Clients who have read about solar in Europe or North America often assume a system exports what it does not use and that the meter runs backwards. For commercial and industrial users in Uganda the utility does not credit exported power. That decides how we size every system.
No net metering, so no export
Uganda has no net metering, the arrangement where the utility credits you for power you send back, for commercial and industrial connections. We therefore configure systems for zero export, which means the inverter limits its output so that nothing flows back into the utility network. The site uses everything the panels produce, or the inverter holds the output back.
This also keeps the approval with the utility simple. Utilities object to backfeed, meaning power flowing back into the network. With export limiting set correctly the system never creates backfeed, so solar on site is not in itself a reason for disconnection.
Why it drives the sizing
If surplus has nowhere to go, any capacity above the daytime load is curtailed, which means it is held back unused. An array sized 30 percent above the site’s daylight consumption produces the same useful energy as a correctly sized one, at a higher cost.
Sizing therefore depends on your load. We need to know what the site draws between roughly nine in the morning and four in the afternoon, on a working day and on a quiet day, and how much of that is steady. For that reason we ask for consumption data, or install logging equipment, before quoting anything above a small system.
Where storage changes the answer
Storage turns curtailed surplus into usable energy by moving midday production into the evening or into an outage. A battery is worth adding on a site with a meaningful evening load or frequent outages. On a site that consumes only in the daytime, the same money usually does more as additional panels.
The approvals side
For grid-tied systems we prepare the applications for the utility and the regulator, set the system for zero export and manage the approval process. The work is procedural more than difficult, and it belongs with whoever builds the system.
Read next
More from the Knowledge Hub
Project update
Seven years, three systems, and a CT scanner at Naggalama
A hospital relationship that started with 12 kWp in 2019 now carries a CT scanner through outages. Each of the three systems solved a different problem.
Technology brief
Why we specify LFP over NMC on weak grids
A battery on a weak Ugandan grid cycles more often than the same battery in a stable market. That decides the chemistry we choose and how long it lasts.
Project update
What full daytime cover actually looks like at a food processor
A 250 kWp grid-tied system at Sumz Food Industries in Nkoowe covers the full daytime process load and is paid for under a power purchase agreement (PPA). The sizing follows from the load and from Uganda’s grid rules.
Project update
Solar on a site that never switches off
Next Media Park in Kampala has 86 kWp of PV and 96 kWh of storage. Broadcast runs 24 hours a day, which changes what a solar system has to be.