Jesa Farm Dairy
200 kWp PV with genset integration
At a large dairy processor, solar now carries processing lines that run without a break.

Project References
Since 2011 we have designed and built solar and battery systems for factories, hospitals, schools, hotels and humanitarian programmes. Every entry is a real client and a real site. Find the one closest to yours.
4,074 kWp
solar PV installed
3,923 kWh
battery storage installed
70+
projects delivered
15
years in East Africa

200 kWp PV with genset integration
At a large dairy processor, solar now carries processing lines that run without a break.

500 kWp PV + 200 kWh battery
This tea factory on a weak rural grid runs on our largest system, 500 kWp of solar with batteries.

250 kWp grid-tied PV
A growing food processor now covers its full daytime load with solar under a power purchase agreement.

Industrial power pre-feasibility study
We looked at power supply options for an industrial site so the investor could decide early.

3 kWp PV + 5 kWh battery
A fleet of electric bicycles now charges on solar.

System analysis, repair and ongoing O&M
We found and fixed the faults in an office solar system, and we now keep it running.
A Backup system keeps the power on during an outage. A Solar Savings system has no battery and lowers the daytime power bill. An Off-Grid system runs without a utility connection. Study and design means we delivered a study or a design, not an installation. Panels are measured in kWp (peak output) and batteries in kWh (energy stored).
Sector
Type of work
System type
Year
Showing 71 of 71 projects

10 kWp PV + 20 kWh battery
A remote lodge in Kitgum that used to run entirely on diesel now runs mostly on solar.

3 kWp PV + 5 kWh battery
A fleet of electric bicycles now charges on solar.

5 kWp PV + 10 kWh battery
Once the school system had proven itself, Amasiko added a second one for its guest house.

About 50 kWp PV + 110 kWh battery
A remote safari lodge now runs through the whole day on solar, even though its grid supply is poor.

32 kWp PV + 60 kWh battery
One backup system now keeps a whole compound of field offices running on a weak grid.

National agrivoltaics guidelines
We helped shape Uganda's national guidelines for solar power and farming on the same land.

50 kWp PV + 80 kWh battery
This boarding school on a weak grid gets the same engineering we put into hospitals.

6 kWp PV + 20 kWh battery
A private home in Kitende now keeps its power on through every outage.

7 kWp PV + 25 kWh battery
A small clinic gets the same backup design as our hospital systems, at a size that fits its budget.

50 kWp PV + 100 kWh battery
A new CT scanner now has its own solar and battery supply that keeps it running through outages.
/Next Media Park (NBS).webp)
86 kWp PV + 96 kWh battery
Uganda's largest independent media house now runs part of its round-the-clock broadcasting on solar.

45 kWp PV + 90 kWh battery
A Soroti resort that relied on a generator now has quiet backup power.

54 kWp PV + 100 kWh battery (supermarket), 39 kWp PV (restaurant)
A supermarket and a restaurant next to each other got two solar systems under one deal.

Solar systems at 250 health centres, plus O&M
We brought solar power to 250 rural health centres across Uganda.

303 kWp grid-tied PV
A large solar system now supplies processing and cold storage at a regional fish farming company, alongside the grid.

5 kWp PV + 10 kWh battery
A vocational college on a weak grid now has steady power for classrooms, workshops and dormitories.

10 kWp PV + 10 kWh battery
The farm at a Soroti youth foundation now has steady power for its tools and lighting.

30 kWp PV + 30 kWh battery
A skills centre in Soroti now has steady power for workshops, classrooms and dormitories.

250 kWp grid-tied PV
A growing food processor now covers its full daytime load with solar under a power purchase agreement.

20 kWp grid-tied PV
A premium Kampala school now pays less for daytime power, with no change to its grid connection.

15 kWp PV + 17 kWh battery
A company working on e-mobility and second-life batteries now runs its workshop on solar.

65 kWp grid-tied PV
A busy private hospital in Kampala went solar without paying anything upfront.

120 kWp PV across two plants
Two neighbouring plants got a solar system each under one power purchase agreement, with no upfront cost.

Solar feasibility studies, dairy cooperatives
We studied whether solar makes sense for dairy cooperatives in Uganda.

Solar-and-storage research lab
We built a solar and battery lab in Kajjansi for research and training.

Solar-and-storage research lab
We built a solar and battery lab in Kisumu for research and training.

Solar-and-storage research lab with floating PV
We built a research lab in Tanzania that includes solar panels floating on water.

Industrial power pre-feasibility study
We looked at power supply options for an industrial site so the investor could decide early.

130 kWp grid-tied PV
A large rooftop system follows the university's academic day and cuts its power bill.

250 kWp PV + 200 kWh battery
A large rose farm exporting to Europe now powers its work and refrigeration with solar and batteries.

500 kWp PV + 200 kWh battery
This tea factory on a weak rural grid runs on our largest system, 500 kWp of solar with batteries.

12 kWp PV + 28 kWh battery
A full apartment block now has silent backup power through frequent outages.

Solar and EV feasibility, 6 residences
We drew up one solar and electric vehicle plan covering six embassy residences.

58 kWp grid-tied PV
A coffee processor and exporter in Namanve now uses solar through its processing hours.

5 kWp PV + 10 kWh battery
These eco-tourism cottages now have quiet power, with no generator noise near the guests.

Energy policy issue briefs, agri-food sector
We wrote energy policy briefs for Uganda's agriculture and food sector.

Solar-supplied boda-boda charging station
The Yujo restaurant now has a charging station for electric boda-bodas that runs on its solar.
Wallbox car charger, solar-supplied
The restaurant added a wall-mounted car charger that runs off its own solar.

7 kWp PV + 15 kWh battery
A rural school with no grid connection now has power for its classrooms and evening study.

100 kWp PV + 120 kWh battery
Theatres and imaging at this hospital cannot lose power, so we gave them uninterrupted supply.

Eco industrial park energy model
We worked out the energy and solar side of a national model for eco industrial parks.

Wallbox EV charger installation
We installed a wall-mounted charger for electric vehicles at the GIZ country office.

Root-cause analysis and repair plan
We found out why an office solar system was underperforming and how to fix it.

System analysis, repair and ongoing O&M
We found and fixed the faults in an office solar system, and we now keep it running.

50 kWp grid-tied PV
A dairy farm in Kapeeka now saves on refrigeration and pumping by running them on solar by day.

95 kWp grid-tied PV across the complex
One set of solar systems now serves a hotel, a restaurant and a supermarket in the same complex.

150 kWp grid-tied PV
Solar now covers the daytime load of a Kampala meat processor and its cold storage.

75 kWp PV + 120 kWh battery
A maker of ceramic water filters now runs its daily production on solar.
RE and efficiency solutions, 7 tea factories
We planned renewable energy and efficiency measures for seven tea factories at once.

200 kWp PV with genset integration
At a large dairy processor, solar now carries processing lines that run without a break.
7 kWp PV + 3.5 kWh supercapacitor
Solar now runs a wastewater treatment pilot inside a working hospital.

National borehole solarisation roadmap
We drew up a national roadmap for moving water boreholes onto solar pumping.

Design of PV plant extension up to 500 kWp
We designed the extension of a radio station's solar plant in Arua.

Site training for green banking participants
We ran a training visit for bankers at a working solar plant.

5 kWp PV + 3.5 kWh battery
A small solar system keeps the lights and phones on at a children's home.

35 kWp grid-tied PV
A Kampala restaurant now pays less for its kitchen and cooling thanks to rooftop solar.

Load assessments and RE design, 10 sites
We measured power use at ten sites and matched each one with a renewable energy solution.

Load assessment and solar backup design
We took an office solar backup from site survey to a specification ready for tender.

Economic feasibility, UNHCR sites
We worked out whether solar makes economic sense at the UNHCR sites.

Load and site assessments, 7 UNHCR sites
We assessed power use and site conditions at seven refugee settlement sites.

28 kWp grid-tied PV
A lakeside resort south of Kampala now uses its own solar power through the day.

22 kWp PV + 21 kWh supercapacitor
Supercapacitor storage now protects the critical wards when the grid drops.

12 kWp grid-tied PV
We built this rural mission hospital's system together with its sister site at Naggalama.

12 kWp grid-tied PV
This first system at Naggalama started a long working relationship with the hospital.

Solar suitability assessment, water sector
We took a first look at where solar could work across National Water's infrastructure.
_edited.webp)
Multi-site feasibility and concept design
Our early work with tea factories led on to later programmes in the sector.

15 kWp PV + 30 kWh battery
Our first project outside Uganda combined four sources of power at one site.

Additional 20 kWp PV, with battery backup for critical loads
Two years later, a second phase added more solar and battery backup for the critical wards.

Solar feasibility and load assessment
We studied the power use at a Kampala hotel and worked out what solar could do for it.

52 kWp grid-tied PV
The first solar system at this Kampala mission hospital cut its daytime power bill.

12 kWp PV + 3.5 kWh battery
One of our first installations for an institution is still running years later.
From the Knowledge Hub
We wrote these notes from our own sites. They explain how the systems behave after years of running and why we made the engineering calls we did.
Project update
A hospital relationship that started with 12 kWp in 2019 now carries a CT scanner through outages. Each of the three systems solved a different problem.
4 min read →Project update
A 250 kWp grid-tied system at Sumz Food Industries in Nkoowe covers the full daytime process load and is paid for under a power purchase agreement (PPA). The sizing follows from the load and from Uganda’s grid rules.
3 min read →Project update
Next Media Park in Kampala has 86 kWp of PV and 96 kWh of storage. Broadcast runs 24 hours a day, which changes what a solar system has to be.
3 min read →Technology brief
A battery on a weak Ugandan grid cycles more often than the same battery in a stable market. That decides the chemistry we choose and how long it lasts.
4 min read →Technology brief
Uganda has no net metering for commercial and industrial users. This fact decides how we size every grid-tied system.
3 min read →